Ring Border Gas Plant – Fort St. John

Sewage generated from the 50 man gas plant facility in a remote section of the north Peace River required updating to meet with current regulatory requirements.  Secondary treatment and disinfection of the wastewater was added upstream of the existing storage lagoons.  The treated effluent, which meets Ministry of Environment reclaimed water standards, is stored in Read more about Ring Border Gas Plant – Fort St. John[…]

Bridal Falls RV Park

  This project services a 197 unit RV Park and clubhouse. Many of the RV lots contain permanent Park Model RVs on dedicated lots. In order to optimize density, the developer elected to install a Membrane Bioreactor (MBR) sewage treatment plant followed by a small foot print rapid infiltration basin. The membranes feature a nominal Read more about Bridal Falls RV Park[…]

Yarrow Eco-Village

Features advanced secondary treatment, UV disinfection and Nitrogen reduction followed by discharge to a polishing constructed wetland. Yarrow Eco-Village is a community of 35 single family residences on a 20 acre organic farm. Their vision for environmental sustainability and location within the Vedder River Fan required that their wastewater be treated to the highest possible standard Read more about Yarrow Eco-Village[…]

Fraser Valley Duck & Goose Farm

Provided process engineering design for a wastewater treatment plant designed to treat 115 m3 per day of high strength (1,000 mg/L) poultry processing water. The design made use of commercially available polyethylene tanks and was optimized for Nitrogen removal. Treated effluent was discharged to a raised sand mound designed for in-situ de-nitrification using reactive porous Read more about Fraser Valley Duck & Goose Farm[…]

Royalwood Golf Course – Sardis, BC

Conducted an Environmental Impact Assessment for the discharge of 23,000 litres per day of treated effluent to a subsurface disposal field. The design considered subsurface groundwater mounding and effluent travel time to down gradient receptors. Prepared construction drawings detailing the treatment works and forced discharge system which consisted of 750 lineal meters of pressurised effluent Read more about Royalwood Golf Course – Sardis, BC[…]

J’s Flood Hope Husky – Hope, BC

Completed a design of a new onsite wastewater treatment system and disposal field to service a busy 24-hour truck stop diner convenience store and gas station in Hope. The new system replaced a malfunctioning existing system and created peace of mind for the owner/operator. The system was designed for a peak flow rate of 21,000 Read more about J’s Flood Hope Husky – Hope, BC[…]

Sunshine Valley RV Resort and Cabins

Provided engineering services for potable water supply and sewage disposal to enable the development of a 150 unit RV Park and 15 cabins. Services included feasibility assessment, well flow testing, environmental impact study, detailed design for the septic field, water treatment plant and sewage treatment plant as well as tendering, construction review and commissioning.

Golden Ears Provincial Park Sewage Treatment Plant

Provided engineering services for the design, specification and tendering of a new sewage treatment plant to service the Alouette campground of Golden Ears Provincial Park. The sewage treatment plant was designed for a capacity of 75m3 per day. Services additionally included the development of tender and contract documents to facilitate the bidding process and manage Read more about Golden Ears Provincial Park Sewage Treatment Plant[…]

Peter Kiewit Sons Company – North Harrison Lake Construction Camp

Arden Consulting Engineers Ltd. was retained by Peter Kiewit Sons to design a sewer collection system, wastewater treatment plant and septic field to service a remote 200 man construction camp. The system was designed for a flow rate of 45,000 L per day. Services included design, regulatory liaison, construction supervison and commissioning of the treatment Read more about Peter Kiewit Sons Company – North Harrison Lake Construction Camp[…]

Coquihalla Toll Plaza

ACE along with Tri-City Contracting Ltd. were recently awarded a design build contract for expansion of the existing washroom facilities and upgrade to the sewage disposal and water supply systems servicing the washrooms at the Coquihalla Toll Plaza. Our innovative concept involved treating the wastewater to a standard such that it could be reclaimed and Read more about Coquihalla Toll Plaza[…]

Pacific Wildlife Research Centre – Ladner, BC

Completed an Investigation and assessment of the malfunctioned Onsite Wastewater Treatment System. Presented rational for failure of the existing system and provided an innovative solution for mitigation of the problem by using a portion of the existing infrastructure. This resulted in significant cost savings to the client. (Environment Canada)

Teen Challenge – Abbotsford, BC

Provided assistance to Teen Challenge Women’s Center located on Sumas Mountain, to permit the expansion their existing facility to accommodate 20 new beds for students. ACE staff provided engineering services to locate a new area with suitable subsurface conditions to support a subsurface disposal field for a design flow of 4,500 Lpd, developed construction drawings Read more about Teen Challenge – Abbotsford, BC[…]

Amry Developments – Oyama, BC

  Provided engineering services for the design and development of a satellite wastewater treatment plant and ground disposal system to service a 27 lot residential subdivision overlooking Kalamalka Lake in Oyama. Services included initial site reconnaissance, development of an Environmental Impact study report, regulatory liaison, system design and construction review.