Royalwood Golf Course – Sardis, BC

Conducted an Environmental Impact Assessment for the discharge of 23,000 litres per day of treated effluent to a subsurface disposal field. The design considered subsurface groundwater mounding and effluent travel time to down gradient receptors. Prepared construction drawings detailing the treatment works and forced discharge system which consisted of 750 lineal meters of pressurised effluent distribution piping.

Leave a Reply