Fraser Valley Duck & Goose Farm

Provided process engineering design for a wastewater treatment plant designed to treat 115 m3 per day of high strength (1,000 mg/L) poultry processing water. The design made use of commercially available polyethylene tanks and was optimized for Nitrogen removal. Treated effluent was discharged to a raised sand mound designed for in-situ de-nitrification using reactive porous media barrier during the winter months and discharged via spray irrigation in the summer months. The overall treatment and dispersal scheme was developed to bring the processing facility into compliance with the industry code of practice.

Leave a Reply