70 Workers Residence
L shaped Type 3 Raised Sand Mound septic system servicing accommodation for workers residence for 70 persons
L shaped Type 3 Raised Sand Mound septic system servicing accommodation for workers residence for 70 persons
Raised sand mound servicing single family residence.
Sewage generated from the 50 man gas plant facility in a remote section of the north Peace River required updating
This project services a 197 unit RV Park and clubhouse. Many of the RV lots contain permanent Park Model
Features advanced secondary treatment, UV disinfection and Nitrogen reduction followed by discharge to a polishing constructed wetland. Yarrow Eco-Village is a
Provided engineering services in conjunction with Ecofluid Systems Inc. to for the design and construction of an onsite wastewater treatment
Provided engineering services in conjunction with Ecofluid Systems Inc. to for the design and construction of an onsite waste-water treatment
Provided process engineering design for a wastewater treatment plant designed to treat 115 m3 per day of high strength (1,000
Completed the design of a new community sewage disposal system to replace an existing failed system for 22 private recreational
Conducted an Environmental Impact Assessment for the discharge of 23,000 litres per day of treated effluent to a subsurface disposal
Completed a design of a new onsite wastewater treatment system and disposal field to service a busy 24-hour truck stop
Provided engineering services for potable water supply and sewage disposal to enable the development of a 150 unit RV Park
Arden Consulting Engineers in conjunction with Kala GeoSciences completed the design for a new subsurface pressure distribution septic field and
Completed the design and oversaw the installation of a new wastewater treatment system and raised sand mound disposal system for
Completed the design for a Type3 wastewater treatment plant and raised sand mound disposal field to service an 80-unit RV
Provided engineering services for the design, specification and tendering of a new sewage treatment plant to service the Alouette campground
Arden Consulting Engineers Ltd. was retained by Peter Kiewit Sons to design a sewer collection system, wastewater treatment plant and
ACE along with Tri-City Contracting Ltd. were recently awarded a design build contract for expansion of the existing washroom facilities
Responsible for the design, tender, construction review and commissioning of a subsurface pressure distribution septic field to service the
Completed an Investigation and assessment of the malfunctioned Onsite Wastewater Treatment System. Presented rational for failure of the existing system
Provided engineering services for a new onsite wastewater treatment system to service a 20 bed fishing lodge. (Tweedsmuir Provincial
Provided assistance to Teen Challenge Women’s Center located on Sumas Mountain, to permit the expansion their existing facility to accommodate
Assisted the Black Tusk Village Strata Council in developing economically viable solutions for retrofitting and upgrading a problematic 20-year-old
ACE has been involved with the design of over 250 single-family residential sewage disposal systems.
Surrey BC. Design of a subsurface disposal field to replace the existing system servicing the restrooms at the Port
Provided engineering services for the design and development of a satellite wastewater treatment plant and ground disposal system to