Arden Consulting Engineers Ltd.
Skip to content
  • Home
  • About
  • Projects
  • Services
  • Testimonials
  • Photo Gallery
  • Links
  • Staff
  • Contact
August 4, 2015 admin

Potable Water Supply and Treatment

 Well Pump Tests

Development of parcels of land that are dependent on private wells for water supply requires proof that water is available in sufficient quantity and that it meets current standards for quality. ACE staff are experienced in the performance of well pump tests to determine the capacity of the well and can facilitate the collection of water samples to ensure the water produced meets current regulatory standards.


Water Treatment

Water Treatment ACE staff is experienced in the planning and development of rural water systems from source selection, to design of infrastructure and selection of treatment works through to project management and construction review services. A Waterworks Construction Permit is typically required for construction, extension or alteration of a water supply system that services anything other than a single-family residence. We have successfully aided hundreds of clients in obtaining water construction permits for both residential developments as well as commercial and recreational facilities.

 

Leave a Reply

You must be logged in to post a comment.

  • Services
    • Septic Systems
    • Potable Water Supply and Treatement
    • Management & Maintenance
    • Studies & Assessments
  • View All
  • Potable Water Treatment
  • Onsite Wastewater Treatment
28049 Myrtle Avenue Abbotsford BC V4X 2P5
rob@arden-engineering.com
604-807-1712
Zerif Lite developed by ThemeIsle