Harrison Hotel

Completed the design and obtained a water construction permit for the upgrade of the existing lake water system to meet the requirements for surface water treatment. The water treatment works consisted of microfiltration, Ultra violet light, and residual chlorination. The treatment works were sized for a capacity of 150 US gpm. Services additionally included construction review and commissioning.

Leave a Reply