Arden Consulting Engineers Ltd. was retained by Peter Kiewit Sons to design a sewer collection system, wastewater treatment plant and septic field to service a remote 200 man construction camp. The system was designed for a flow rate of 45,000 L per day. Services included design, regulatory liaison, construction supervison and commissioning of the treatment works. Given the sensitivity of the local environment it was essential that the system was designed to meet and exceed the discharge standards as prescribed in the Municipal Sewage Regulation.
Peter Kiewit Sons Company – North Harrison Lake Construction Camp